Chapadao - Jatai Transmission Line

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

In March 2009, Transenergia Renovavel consortium, a partnership of the state-owned company Furnas (49%), Delta Construtora (25.5%) and Fuad Rassi (25.5%), was awarded in a competitive bidding process run by the regulatory agency Aneel the 30-year contract to build and operate substations and a 600-km transmission line located in the states of Goias and Mato Grosso. Besides Transenergia, eight othe

Project Information FAQ

Project Information

5 Q
The project “Chapadao - Jatai Transmission Line” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In March 2009, Transenergia Renovavel consortium, a partnership of the state-owned company Furnas (49%), Delta Construtora (25.5%) and Fuad Rassi (25.5%), was awarded in a competitive bidding process run by the regulatory agency Aneel the 30-year contract to build and operate substations and a 600-km transmission line located in the states of Goias and Mato Grosso. Besides Transenergia, eight other companies took part in the contest: ABENGOA CONCESSÕES BRASIL HOLDING S.A.; ALUPAR INVESTIMENTO S.A.; BIMETAL INDÚSTRIA METALÚRGICA LTDA.; COBRA INSTALACIONES Y SERVICIOS S.A.; COPEL GERAÇÃO E TRANSMISSÃO S.A.; CTEEP - COMPANHIA DE TRANSMISSÃO DE ENERGIA ELÉTRICA PAULISTA; and ELECNOR TRANSMISSÃO DE ENERGIA S.A. Transenergia presented the lowest required annual revenue, a total value of US$ 17.2 million (BRL 34.5 million), 19.2% the ceiling set by the regulatory agency. This value was divided into three components: allowed annual revenue of US$ 5.6 million (BRL 11.3 million); annual transmission revenues to be paid by the generating companies for the use of transmission lines shared by all generating companies contracting the transmission services totaling US$ 7 million (BRL 14 million); and annual transmission revenues to be paid by the generating companies for the use of transmission lines which were build to attend the exclusive needs of each generating company contracting the transmission services totaling US$ 4.5 million (BRL 9 million). Transnergia Renovavel committed to invest US$ 154.4 million (BRL 318.8 million) in the transmission lines and substations. Financial closure was achieved in December 2009, when the sponsors were granted a US$ 52.4 million (BRL 104. 8 million) loan from BNDES and a US$ 50 million (BRL 100 million) loan from Fundo Constitucional do Centro Oeste. The remaining cost was set to be financed with the sponsors’ internal resources. Construction works commenced in December 2009 and were expected to be completed by November 2010. Besides the investment in infrastructure, the private sponsors were also responsible to reimburse the companies which were responsible for the project design and for the preparation of the EIA report. This represented an additional cost of US$ 342 thousand (BRL 684 thousand). Commercial operations commenced in December 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data