Chapelwood Court Drainage Improvements
Bidding · Texas · Last reported Jul 2025
Source: Dodge
This project generally includes drainage improvements on Chapelwood Court. The project includes the removal and disposal of 200 linear feet of existing 18 storm sewer and homemade inlets and the installation of 290 linear feet of 24 RCP storm sewer and inlets. Additionally, the project includes a concrete point repair, driveway replacement, and 6 PVC water line adjustment.
- Status
- Prospective
- Sector
- Raw Materials, Waste Processing and Treatment, Water Supply and Storage, Road, Car parking, Automotive, Commercial, Cement, Government
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Chapelwood Court Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project generally includes drainage improvements on Chapelwood Court. The project includes the removal and disposal of 200 linear feet of existing 18 storm sewer and homemade inlets and the installation of 290 linear feet of 24 RCP storm sewer and inlets. Additionally, the project includes a concrete point repair, driveway replacement, and 6 PVC water line adjustment. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Waste Processing and Treatment, Water Supply and Storage, Road, Car parking, Automotive, Commercial, Cement, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
