logo

Chapleau Objibwe First Nation water treatment plant equipment upgrade

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Upgrades include the following: Replacing 3 pressure tanks in the water treatment plant as they are heavily rusted in the inside and causing bladders to rupture. Inspection and repair as needed the water treatment plant generator which has not been serviced in 5 years. Replacing the failed Uninterruptible Power Supply (UPS) battery backup for the Ultra Violet (UV) Lights so that the water is treat

Project Information FAQ

Project Information

4 Q
The project “Chapleau Objibwe First Nation water treatment plant equipment upgrade” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Upgrades include the following: Replacing 3 pressure tanks in the water treatment plant as they are heavily rusted in the inside and causing bladders to rupture. Inspection and repair as needed the water treatment plant generator which has not been serviced in 5 years. Replacing the failed Uninterruptible Power Supply (UPS) battery backup for the Ultra Violet (UV) Lights so that the water is treated with UV at all times. Replacing and upgrade the Supervisory control and data acquisition (SCADA) computer to a new Window 7 computer with new licenses as it is over 10 years old and currently failing. Replacing the 4 baseboard heaters within the water treatment plant, one of which is in the generator room. Replacing or repairing block heater for the backup generator as it is currently not working and could cause start-up issues and damage the generator. Replacing all 8 bulbs and 8 sleeves for the UV units to ensure proper disinfection and lower risk to community. Repairing 3 sodium hypochlorite pumps with 3 new rebuilt kits. Replacing the controller and the sensor for the UV lights as the current one is failing. As the water will be less at risk of contamination, this will reduce the burden on the Provincial health system.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data