Chapman Field Park - Kayak Launch Replacement
Sector: Cement • Location: Miami, Florida, United States of America
Source: Dodge
Remove the existing sunken kayak launch and anchor piles. Install new floating kayak launch system and anchor piles. Reinstall the existing aluminum gangway. The gangway will be attached to the existing concrete ramp and rests on the new floating kayak launch
- Status
- Closed
- Sector
- Cement, Government, Metal, Car parking, Steel, Automotive, Manufacturing (Industrial), Commercial
- Location
- Miami, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Chapman Field Park - Kayak Launch Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove the existing sunken kayak launch and anchor piles. Install new floating kayak launch system and anchor piles. Reinstall the existing aluminum gangway. The gangway will be attached to the existing concrete ramp and rests on the new floating kayak launch |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Miami |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Metal, Car parking, Steel, Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
