Char Dham Railway Project
Sector: Rail • Location: Uttarakhand, India
Source: News18
The Char Dham Railway Project involves the construction of India's longest railway tunnel as part of the Rishikesh-Karnaprayag Rail Line, which spans 125.20 km, with 105 km of the track passing through tunnels. This project aims to significantly reduce travel time and enhance connectivity for the Chardham pilgrimage.
- Status
- Under Construction
- Sector
- Rail, Tunnel, Mass Transit, Government
- Location
- Uttarakhand, India
- Updated
- 22 Jul 2026
- Source
- News18
ConstructChat
Ask ConstructChat about Char Dham Railway Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Char Dham Railway Project involves the construction of India's longest railway tunnel as part of the Rishikesh-Karnaprayag Rail Line, which spans 125.20 km, with 105 km of the track passing through tunnels. This project aims to significantly reduce travel time and enhance connectivity for the Chardham pilgrimage. |
Original sector | Railway |
Location
Country | India |
State | Uttarakhand |
Source
Source | News18 |
URL |
More Details
Record type | Project |
Sector | Rail, Tunnel, Mass Transit, Government |
Article published date | 2025-01-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
