logo
Project

Charcoal Briquettes Making Project

The status, timeline and source of this project. A free account opens every field.

Source: United Nations Industrial Development Organization (UNIDO)

This project involves the establishment of a plant for charcoal briquettes making from biomass as an alternative to decaying hydro power, costly solar power and unsustainable charcoal burning practices. Charcoal burning activities are at a faster rate and this has highly contributed to massive deforestation and forest degradation. Additionally, the National Strategy to reduce deforestation and for

Status
Closed
Sector
Biomass, Hydro, Power Generation (CCGT), Solar, Rail, Government, Manufacturing (Industrial)
Location
Other, Zambia
Updated
22 Jul 2026
Source
United Nations Industrial Development Organization (UNIDO)

ConstructChat

Ask ConstructChat about Charcoal Briquettes Making Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Charcoal Briquettes Making Project” is an infrastructure initiative in the Biomass sector, located in Other, Zambia. Taiyo aggregates data on it from United Nations Industrial Development Organization (UNIDO).

Participants

Sponsoring Agency

Company

Status

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project involves the establishment of a plant for charcoal briquettes making from biomass as an alternative to decaying hydro power, costly solar power and unsustainable charcoal burning practices. Charcoal burning activities are at a faster rate and this has highly contributed to massive deforestation and forest degradation. Additionally, the National Strategy to reduce deforestation and forest degradation shows an estimated forest degradation rate of 250,000 to 300, 000 hectares per year. Thus, the project envisions to change this narrative by using readily available natural resources as an alternative to charcoal burning. This project is profitable with annual sales of ZMW521, 000 at a production capacity of 253 tons in the first year of operation. Additionally, the raw materials for this project are readily available. The Project is open for a joint venture and the total investment cost is ZMW421, 961 (USD24, 821.2) at exchange rate of ZMW17. Key and critical components for this project are; a crusher, air flow dryer, briquette making machine and a carbonization furnace which are estimated at ZMW100, 000, ZMW120,000, ZMW135,000 and ZMW50,000 respectively. Hence, a Private investor is required to provide investment resources in cash and in kind.

Original sector

Production, transmission and distribution of electricity

Location

Country

Zambia

City

Other

Source

Source reliability

High

Source

United Nations Industrial Development Organization (UNIDO)

URL

More Details

Record type

Project

Sector

Biomass, Hydro, Power Generation (CCGT), Solar, Rail, Government, Manufacturing (Industrial)

Article published date

2023-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project