logo
ProjectSub Bidding, Start

Chardon LSD Stadium Pressbox Replacement

Sector: Electric Vehicles (EVs) • Location: Chardon, Ohio, United States of America

Source: Dodge

Miscellaneous Recreational, Stadium. Sub bids to Construction Manager At Risk November 03 at 12:00 PM (EST)

Status
Prospective
Sector
Electric Vehicles (EVs), Water Supply and Storage, Stadium, Power Generation (CCGT), Geothermal, Forest Products and Packaging, Metal, Consumer Products, Telecommunications, Bridge, Waste Processing and Treatment, Cement, Steel, Automotive, Rail, Warehouse, Solar, Hospital, Car parking, Manufacturing (Industrial), Residential, Power Transmission, Commercial, Road, Government
Location
Chardon, Ohio, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Chardon LSD Stadium Pressbox Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Chardon LSD Stadium Pressbox Replacement” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in Chardon, Ohio, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

sub bidding, start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Miscellaneous Recreational, Stadium. Sub bids to Construction Manager At Risk November 03 at 12:00 PM (EST)

Original sector

Industry, Trade And Services

Budget

Location

Country

United States of America (USA)

State

Ohio

City

Chardon

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Electric Vehicles (EVs), Water Supply and Storage, Stadium, Power Generation (CCGT), Geothermal, Forest Products and Packaging, Metal, Consumer Products, Telecommunications, Bridge, Waste Processing and Treatment, Cement, Steel, Automotive, Rail, Warehouse, Solar, Hospital, Car parking, Manufacturing (Industrial), Residential, Power Transmission, Commercial, Road, Government

Article published date

2026-10-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project