Charging Station (Alteration)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
PROPOSED GENERAL CONSTRUCTION AND ADDITION OF STORM DRAINAGE SYSTEM AT EXISTING EV CHARGING STATION, NO CHANGE IN USE, EGRESS OR OCCUPANCY. SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH STORM DRAINAGE AT EXISTING EV CHARGING STATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Status
- Prospective
- Sector
- Water Supply and Storage, Electric Vehicles (EVs), Waste Processing and Treatment, Power Generation (CCGT), Commercial, Automotive, Manufacturing (Industrial)
- Location
- Bushwick, New York, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Charging Station (Alteration)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | PROPOSED GENERAL CONSTRUCTION AND ADDITION OF STORM DRAINAGE SYSTEM AT EXISTING EV CHARGING STATION, NO CHANGE IN USE, EGRESS OR OCCUPANCY. SUBSEQUENT FILING FOR PLUMBING WORK IN CONJUNCTION WITH STORM DRAINAGE AT EXISTING EV CHARGING STATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Bushwick |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Electric Vehicles (EVs), Waste Processing and Treatment, Power Generation (CCGT), Commercial, Automotive, Manufacturing (Industrial) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
