Chariot Solar Project
Sector: Solar • Location: Hinsdale, New Hampshire, United States
Source: New Hampshire Business Review
The Chariot Solar Project, proposed by NextEra Energy, aims to be the largest solar farm in New Hampshire, utilizing 47 acres of land in Hinsdale. It is expected to generate significant renewable energy and create jobs while contributing to local tax revenues.
- Status
- Prospective
- Sector
- Solar, Raw Materials
- Location
- Hinsdale, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- New Hampshire Business Review
ConstructChat
Ask ConstructChat about Chariot Solar Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Chariot Solar Project, proposed by NextEra Energy, aims to be the largest solar farm in New Hampshire, utilizing 47 acres of land in Hinsdale. It is expected to generate significant renewable energy and create jobs while contributing to local tax revenues. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Hinsdale |
Source
Source | New Hampshire Business Review |
URL |
More Details
Record type | Project |
Sector | Solar, Raw Materials |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
