logo

Charles River Combined Sewer Overflow Control Project

Sector: Waste Processing and Treatment • Location: Boston, Cambridge, Somerville, Massachusetts, United States

Source: Boston Herald

Project
Planned

The Massachusetts Water Resources Authority (MWRA) has proposed a long-term control plan to address combined sewer overflows (CSOs) in the Charles River and other area water bodies. The plan includes the construction of two storage tanks with a capacity of 12.6 million gallons, 446 acres of sewer separation, and two storage conduits. The project aims to eliminate CSO discharges by 2050 and prepare

Status
Prospective
Sector
Waste Processing and Treatment, Water Supply and Storage
Location
Boston, Cambridge, Somerville, Massachusetts, United States of America
Updated
22 Jul 2026
Source
Boston Herald

ConstructChat

Ask ConstructChat about Charles River Combined Sewer Overflow Control Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Charles River Combined Sewer Overflow Control Project” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Boston, Cambridge, Somerville, Massachusetts, United States. Taiyo aggregates data on it from Boston Herald.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Massachusetts Water Resources Authority (MWRA) has proposed a long-term control plan to address combined sewer overflows (CSOs) in the Charles River and other area water bodies. The plan includes the construction of two storage tanks with a capacity of 12.6 million gallons, 446 acres of sewer separation, and two storage conduits. The project aims to eliminate CSO discharges by 2050 and prepare for heavier rainfall due to climate change. The total cost of the plan, including projects on the Alewife Brook and Mystic River, is estimated at $1.28 billion, with the Charles River project costing around $690 million and expected to last 28 to 33 years.

Original sector

Water and Wastewater

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston, Cambridge, Somerville

Source

Source

Boston Herald

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage

Article published date

2026-05-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project