logo
ProjectClosed

Charleston Pump Station No. 39 Replacement

Sector: Water Supply and Storage • Location: Charleston, South Carolina, United States of America

Source: Dodge

CWS request interested contractors to apply for prequalification for the project consisting of labor and materials for one (1) 6,000 GPM triplex pump station, demolition of existing pump station, approx.100 LF of 30 gravity sewer, 80 LF of 20 force main, 60 LF of 6 force main, one (1) manhole, generator, odor control, modular electrical control bldg., overhead hoist system, and all appurtenances.

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment, Commercial
Location
Charleston, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Charleston Pump Station No. 39 Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Charleston Pump Station No. 39 Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Charleston, South Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

CWS request interested contractors to apply for prequalification for the project consisting of labor and materials for one (1) 6,000 GPM triplex pump station, demolition of existing pump station, approx.100 LF of 30 gravity sewer, 80 LF of 20 force main, 60 LF of 6 force main, one (1) manhole, generator, odor control, modular electrical control bldg., overhead hoist system, and all appurtenances.

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Charleston

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment, Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project