Charlie Lake Sewer Upgrades
Sector: Water Supply and Storage • Location: Dawson Creek, British Columbia, Canada
Source: Dodge USA
The Peace River Regional District (Regional District) is requesting tenders from qualified proponents to install 32 meters of 150mm HDPE DR 11 low-pressure sewer main, along with valve installations at the proposed sewer tie-in locations.
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Dawson Creek, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Charlie Lake Sewer Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Peace River Regional District (Regional District) is requesting tenders from qualified proponents to install 32 meters of 150mm HDPE DR 11 low-pressure sewer main, along with valve installations at the proposed sewer tie-in locations. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Dawson Creek |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
