logo

Charlie Lake Sewer Upgrades

Sector: Water Supply and Storage • Location: Dawson Creek, British Columbia, Canada

Source: Dodge USA

Project
Start

The Peace River Regional District (Regional District) is requesting tenders from qualified proponents to install 32 meters of 150mm HDPE DR 11 low-pressure sewer main, along with valve installations at the proposed sewer tie-in locations.

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
Dawson Creek, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Charlie Lake Sewer Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Charlie Lake Sewer Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Dawson Creek, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Peace River Regional District (Regional District) is requesting tenders from qualified proponents to install 32 meters of 150mm HDPE DR 11 low-pressure sewer main, along with valve installations at the proposed sewer tie-in locations.

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Dawson Creek

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project