logo

CHARLOTTE ROWELL BLVD FM SR 10/US 78 TO SR 11/MONROE CITY

Sector: Road • Location: Monroe, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The scope of improvements includes extending the existing two lane rural highway section of SR 138 from just south of SR 10/ US 78 current terminus at the S.R. 10/U.S. 78 interchange in a northeasterly direction to S.R. 11 at the intersection of Double Springs Church Road. The typical rural roadway section will include a variable right-of-way width, two 12-foot through lanes, with right and left

Project Information FAQ

Project Information

4 Q
The project “CHARLOTTE ROWELL BLVD FM SR 10/US 78 TO SR 11/MONROE CITY” is an infrastructure initiative in the Road sector, located in Monroe, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The scope of improvements includes extending the existing two lane rural highway section of SR 138 from just south of SR 10/ US 78 current terminus at the S.R. 10/U.S. 78 interchange in a northeasterly direction to S.R. 11 at the intersection of Double Springs Church Road. The typical rural roadway section will include a variable right-of-way width, two 12-foot through lanes, with right and left turn lanes at major intersections and 10-foot shoulders. The existing westbound trumpet type exit ramp from SR 10/ US 78 to SR 138 will be modified to a typical diamond type which will intersect with the new 2-lane extension. The new roadway will be full access controlled through the interchange ramp terminal. It will become a local road from the ramp terminal north to SR 11.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data