Charlotte Site Preparation and Utilities for Modular Setup
Sector: Water Supply and Storage • Location: Port Charlotte, Florida, United States of America
Source: Dodge
The project includes all utilities work, paving, grading, drainage improvements, walkways, elevated boardwalks, ramps, as well as temporary modular unit foundation systems and hookups as indicated on the contract documents specified herein
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Car parking, Power Transmission, Seaport, Automotive, Power Generation (CCGT)
- Location
- Port Charlotte, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Charlotte Site Preparation and Utilities for Modular Setup
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes all utilities work, paving, grading, drainage improvements, walkways, elevated boardwalks, ramps, as well as temporary modular unit foundation systems and hookups as indicated on the contract documents specified herein |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Port Charlotte |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Car parking, Power Transmission, Seaport, Automotive, Power Generation (CCGT) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
