logo

Charlottetown Eastern Gateway - Storm Water Management

Sector: Water Supply and Storage • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
Completed

The project consists of replacing on an aged and undersized storm water system (100% new). Due to increased residential development in the neighbourhood and combined with heavy rainfall events, the area is prone to flooding. The project scope would include abandoning the existing storm water system and installing a new system that collects and manages the storm flows during peak rainfall events to

Project Information FAQ

Project Information

3 Q
The project “Charlottetown Eastern Gateway - Storm Water Management” is an infrastructure initiative in the Water Supply and Storage sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of replacing on an aged and undersized storm water system (100% new). Due to increased residential development in the neighbourhood and combined with heavy rainfall events, the area is prone to flooding. The project scope would include abandoning the existing storm water system and installing a new system that collects and manages the storm flows during peak rainfall events to eliminate the possibility of future flash flood events. The linear storm water asset is proposed to be approximately 800m, which will also include large culverts. The work will be more defined once the study is done (see project ICIP-PLAN-2021-003). The project aims to eliminate the possibility of future flash floods with the increased residential development and heavy rainfall.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data