logo

Charlottetown Simmons Sports Centre

Sector: Stadium • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
Completed

The project consists of a new single pad arena, outdoor swimming pool, with other amenities such as walking track and community spaces to replace aging infrastructure (Simmons Sports Centre). The scope of the work includes the following proposed amenities: one NHL size ice pad, fixed seating of 300 plus, 6 standard size dressing rooms, referee’s room, community multi-purpose room, warming room (se

Project Information FAQ

Project Information

5 Q
The project “Charlottetown Simmons Sports Centre” is an infrastructure initiative in the Stadium sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of a new single pad arena, outdoor swimming pool, with other amenities such as walking track and community spaces to replace aging infrastructure (Simmons Sports Centre). The scope of the work includes the following proposed amenities: one NHL size ice pad, fixed seating of 300 plus, 6 standard size dressing rooms, referee’s room, community multi-purpose room, warming room (seating capacity of 100), indoor walking track, elevator, canteen/kitchen area, outdoor 25-meter pool with 6 swim lanes with access to change rooms, user group storage areas, staff office space, parking, and access to washrooms for sport field users. The aim of the project is to replace the current Simmons Sports Centre Arena and Outdoor Pool with a modern, accessible, environmentally friendly, and sustainable facility. The cost of demolition of existing facility is included in this application. Based on Class D Cost Estimate, and the overall square footage is estimated to be 70,406 with the following breakdown: Level 1 (Arena, Walking Track, Dressing Rooms) 30,440 sq ft Level 1 (Mechanical - back addition with low roof) 3,315 sq ft Level 2 (Spectator Seating, warm room, washroom) 8,407 sq ft Front Addition (Multi-purpose room, lobby, pool changing rooms, kitchen/canteen, washrooms) 12,648 sq ft Pool 4176 sq ft Pool Basement 4176 sq ft Pool Deck 7244 sq ft

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data