logo

Chas Pediatric Building Level 2

Sector: Power Generation (CCGT) • Location: Spokane, Washington, United States of America

Source: Dodge USA

Project
Start

Project Title: Chas Pediatric Ti - Level 2 Phase 2-A & 2-B Ti Remodel Of A Portion Of An Existing Suite On The Second Floor Of 5-Story Building. Project Scope Includes Modifying Existing Mechanical, Plumbing, And Electrical.

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Residential, Hospital, Hotel
Location
Spokane, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Chas Pediatric Building Level 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Chas Pediatric Building Level 2” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Spokane, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Title: Chas Pediatric Ti - Level 2 Phase 2-A & 2-B Ti Remodel Of A Portion Of An Existing Suite On The Second Floor Of 5-Story Building. Project Scope Includes Modifying Existing Mechanical, Plumbing, And Electrical.

Budget

Location

Country

United States of America (USA)

State

Washington

City

Spokane

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Residential, Hospital, Hotel

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project