Chas Pediatric Building Level 2
Sector: Power Generation (CCGT) • Location: Spokane, Washington, United States of America
Source: Dodge USA
Project Title: Chas Pediatric Ti - Level 2 Phase 2-A & 2-B Ti Remodel Of A Portion Of An Existing Suite On The Second Floor Of 5-Story Building. Project Scope Includes Modifying Existing Mechanical, Plumbing, And Electrical.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Residential, Hospital, Hotel
- Location
- Spokane, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Chas Pediatric Building Level 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project Title: Chas Pediatric Ti - Level 2 Phase 2-A & 2-B Ti Remodel Of A Portion Of An Existing Suite On The Second Floor Of 5-Story Building. Project Scope Includes Modifying Existing Mechanical, Plumbing, And Electrical. |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Spokane |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Residential, Hospital, Hotel |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
