Chatham-Kent Ptaszynski Branch of the Kersey Drain
Sector: Water Supply and Storage • Location: Chatham, Ontario, Canada
Source: Dodge
The proposed work consists of approximately 1256 lineal metres of open ditch cleanout, including the construction of 38 metres of 900mm diameter road culvert and approximately 35 metres of 600mm diameter closed drain sewer pipe and road culvert, with related appurtenances.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial
- Location
- Chatham, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Chatham-Kent Ptaszynski Branch of the Kersey Drain
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work consists of approximately 1256 lineal metres of open ditch cleanout, including the construction of 38 metres of 900mm diameter road culvert and approximately 35 metres of 600mm diameter closed drain sewer pipe and road culvert, with related appurtenances. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Chatham |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
