Chatham Wastewater Pump Station - #1 (Rehabilitation)
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
This is to design and carry out construction work for rehabilitating the existing aged Pump Station. The work includes: - Upgrading existing aged and inefficient equipment (pumps, valves and electrical) - Upgrading discharge piping to be more efficient and meet current mechanical and electrical codes - Carrying out a flow capacity study along with a discharge pipe and downstream condition assessme
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This is to design and carry out construction work for rehabilitating the existing aged Pump Station. The work includes: - Upgrading existing aged and inefficient equipment (pumps, valves and electrical) - Upgrading discharge piping to be more efficient and meet current mechanical and electrical codes - Carrying out a flow capacity study along with a discharge pipe and downstream condition assessment - Optimizing pump discharge and increasing pump system efficiency by completing inflow monitoring, and specifying pumps that would operate steadily at a higher efficiency throughout the anticipated flow range - Incorporating a permanent bypass arrangement to enable continuous service of the pump station and minimize future disruptions of service - Raising the entire pump control system out of the dry well and installing an above grade weatherproof cabinet to improve long-term operational safety - Providing additional ventilation in the wet well in order to provide a safe work environment to operations staff |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
