Chattanooga (TN) Walmart Supercenter 5251-1005 SP
Sector: Manufacturing (Industrial) • Location: Chattanooga, Tennessee, United States of America
Source: Dodge USA
Pickup 2.0 Installation Of New Reach-in Refrigerated Cases And Rcu's Addition & Installation Of New Storage Racks. Addition Of Surface Mounted Automatic Sliding Door And Associate Canopy. Addition Of New Pickup Parking Stalls Partial Demolition Of Floor Slab As Needed For Trenching Ofnew Drainage Piping At Refrigerated Cases. Partial Demolition Of Paving And Sidewalk As Required For New Storm Util
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Transmission, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Automotive
- Location
- Chattanooga, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Chattanooga (TN) Walmart Supercenter 5251-1005 SP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Pickup 2.0 Installation Of New Reach-in Refrigerated Cases And Rcu's Addition & Installation Of New Storage Racks. Addition Of Surface Mounted Automatic Sliding Door And Associate Canopy. Addition Of New Pickup Parking Stalls Partial Demolition Of Floor Slab As Needed For Trenching Ofnew Drainage Piping At Refrigerated Cases. Partial Demolition Of Paving And Sidewalk As Required For New Storm Utility Connection |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Chattanooga |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Commercial, Waste Processing and Treatment, Power Generation (CCGT), Car parking, Automotive |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
