Chattaroy Area Sanitary Sewer System Rehab Contract 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project consists of approximately 325 LF of 8 PVC gravity sewer line, removing and replacing 1,450 LF of 8 PVC gravity sewer line, 230 LF of DIP gravity sewer line, 440 LF of 4 PVC service lateral, 225 LF of 16 bore and jack steel casing, 4,275 LF of 8 PVC gravity sewer pipe lining, 3 manholes, one doghouse manhole, one flat top manhole, removing and replacing 13 manholes, rehabilitating 18 ma
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government, Steel, Metal, Waste Processing and Treatment, Residential
- Location
- Chattaroy, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Chattaroy Area Sanitary Sewer System Rehab Contract 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of approximately 325 LF of 8 PVC gravity sewer line, removing and replacing 1,450 LF of 8 PVC gravity sewer line, 230 LF of DIP gravity sewer line, 440 LF of 4 PVC service lateral, 225 LF of 16 bore and jack steel casing, 4,275 LF of 8 PVC gravity sewer pipe lining, 3 manholes, one doghouse manhole, one flat top manhole, removing and replacing 13 manholes, rehabilitating 18 manholes, 20 VF of manhole riser pipe, reconnecting 125 existing customer service laterals, pump st... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Chattaroy |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government, Steel, Metal, Waste Processing and Treatment, Residential |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
