Chattisgarh / Maharashtra Border - Wainganga Bridge NH - 6

Sector: Road • Location: India

Source: World Bank Group

Project
Active

In December 2006, National Highway Authority of India (NHAI) signed a 20 year concession agreement (includes a construction period of 30 months) to a consortium of India’s Ashoka Buildcon Limited and Infrastructure Development Finance Corporation (IDFC) to strengthen and widen the 80 km section on National Highway 6 (NH6) between Raipur (in the state of Chattisgarh) and Nagpur (in the state of Mah

Project Information FAQ

Project Information

4 Q
The project “Chattisgarh / Maharashtra Border - Wainganga Bridge NH - 6” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2006, National Highway Authority of India (NHAI) signed a 20 year concession agreement (includes a construction period of 30 months) to a consortium of India’s Ashoka Buildcon Limited and Infrastructure Development Finance Corporation (IDFC) to strengthen and widen the 80 km section on National Highway 6 (NH6) between Raipur (in the state of Chattisgarh) and Nagpur (in the state of Maharashtra). Under the contract, the consortium was responsible for the design, expansion, finance, operation and maintenance of the existing two-lane highway to a four-lane highway with paved shoulders. The expansion project, part of National Highway Development Project - Phase IIIA, was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. The consortium established Ashoka Highways (Bhandara) Limited (AHBL), a special purpose vehicle, to implement the project. The consortium won the competitive tender, conducted by NHAI, by requesting the lowest grant of US$ 2.5 million. Apart from this upfront payment by NHAI, under the contract, AHBL was to recover the capital costs and operating costs including returns through tolls during the concession period (excluding the construction period). The concession agreement for the project was signed in December 2006. The total capital cost of the project was estimated at US$ 106 million. Construction on the project was scheduled to begin in June 2006 and was expected to be completed by December 2008. None None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data