Chattogram Water Supply Improvement Project
Sector: Water Supply and Storage • Location: Bangladesh
Source: World Bank Group
The project (Phase I of the Bangladesh Water Security and WSS MPA) will support the Government of Bangladesh in achieving the SDG Goal 6 and advance the utility reform agenda ensuring long-term sustainability of Water Supply and Sanitation (WSS) service provision in Chattogram. The MPA will comprise four phases spanning over nine years (2024-2033) to support 15 cities with an estimated 20 million
- Status
- Prospective
- Sector
- Water Supply and Storage, Power Transmission, Biomass, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Government
- Location
- Bangladesh
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Chattogram Water Supply Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project (Phase I of the Bangladesh Water Security and WSS MPA) will support the Government of Bangladesh in achieving the SDG Goal 6 and advance the utility reform agenda ensuring long-term sustainability of Water Supply and Sanitation (WSS) service provision in Chattogram. The MPA will comprise four phases spanning over nine years (2024-2033) to support 15 cities with an estimated 20 million beneficiaries. The program framework includes three mutually reinforcing categories of interventions: (i) strengthen institutions and policies for planning, service delivery and regulations, (ii) improve infrastructure and service delivery systems, and (iii) enhance financial sustainability and access to finance for capital and operational expenditures. Phase 1 of the MPA will lay the foundation of implementing this framework by implementing important activities across all three categories in Chattogram and introducing the performance orientation in Chattogram Water Supply and Sewerage Authority's (CWASA) operations through Performance Based Conditions (PBCs) for accessing IDA resources. The project builds on the achievements of the previous Bank-funded Chittagong Water Supply Improvement and Sanitation Project (CWSISP) that closed on December 31, 2020 by financing investment in infrastructure and by supporting institutional strengthening. The project will include: (a) expansion of the water distribution system, following the District Metered Area (DMA) concept to enable efficient, reliable and equitable water supply to all customers within the utility’s service area; (b) expansion of water supply and non-network sanitation services in Low-income Communities (LIC); and (c) support to strengthen the Chattogram Water Supply and Sewerage Authority's (CWASA) utility systems, financial performance and creditworthiness including tariff roadmap, and building CWASA’s capacity for planning, delivering, and managing WSS services. The proposed project provides emphasis on improving service delivery and institutional sustainability while scaling up access. |
Original sector | Water, Sanitation and Waste Management |
Budget |
Location
Country | Bangladesh |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Biomass, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Bangladesh
- Rooppur Nuclear Power Plant Ishwardi
- Meghnaghat Combined Cycle GasFired Power Plant Meghnaghat
- Bangladesh Bhola IPP
- Moheshkhali Floating LNG Terminal
- Gandharbpur Drinking Water Treatment Plant
- Chittagong Container Terminal (first contract)
- Development of Water Distribution and Supply Facilities at Purbachal New Town
- SEA-ME-WE5 Bangladesh
