logo
ProjectActive

Chayadevi Hydro Power Scheme

One of 9,331 projects Taiyo tracks in Karnataka.

Source: World Bank Group

A 24 MW run of the river project, it is located 5 kms downstream of the picturesque Narayanpur dam and 120 kms from Raichur in Karnataka. Total cost of setting up of the project is estimated at Rs.800.51 millions. The funding for the project was secured in 2004 and came from term loan (Rs.501.86 million), Capital subsidy (Rs.37.5 million) and equity (Rs.261.15 million). Work on the project began

Status
Prospective
Sector
Hydro, Power Generation (CCGT), Steel, Commercial, Water Supply and Storage, Government
Location
Karnataka, India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Chayadevi Hydro Power Scheme

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Chayadevi Hydro Power Scheme” is an infrastructure initiative in the Hydro sector, located in Karnataka, India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 24 MW run of the river project, it is located 5 kms downstream of the picturesque Narayanpur dam and 120 kms from Raichur in Karnataka. Total cost of setting up of the project is estimated at Rs.800.51 millions. The funding for the project was secured in 2004 and came from term loan (Rs.501.86 million), Capital subsidy (Rs.37.5 million) and equity (Rs.261.15 million). Work on the project began in September 2004 and commissioning of the plant is scheduled in Feb 2007. http://cdm.unfccc.int/Projects/DB/DNV-CUK1167373384.24/view http://cdm.unfccc.int/filestorage/0QIN09ITCZJY03OCH383RG4AADQN1W/Chayadevi%20PDD.pdf?t=dkF8MTI5NTAzMTg1MC4yOQ==|A8WstlhgSeCthgXACrjRSGJhusE=

Original sector

Energy

Budget

Location

Country

India

State

Karnataka

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Steel, Commercial, Water Supply and Storage, Government

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project