Chaykend Small Hydroelectric Power Plant
Sector: Road • Location: Kalbajar, Kalbajar district, Azerbaijan
Source: Caliber.Az
A 5 MW small hydroelectric power plant supplied by an 8,500-meter derivation pipeline from the Tartar River, equipped with environmentally friendly technologies and integrated into the national SCADA system. It provides clean energy for approximately 7,000 people and includes a 5 km, 10 kV transmission line for grid integration.
- Status
- Closed
- Sector
- Road, Power Generation (CCGT), Government
- Location
- Kalbajar, Kalbajar district, Azerbaijan
- Updated
- 22 Jul 2026
- Source
- Caliber.Az
ConstructChat
Ask ConstructChat about Chaykend Small Hydroelectric Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 5 MW small hydroelectric power plant supplied by an 8,500-meter derivation pipeline from the Tartar River, equipped with environmentally friendly technologies and integrated into the national SCADA system. It provides clean energy for approximately 7,000 people and includes a 5 km, 10 kV transmission line for grid integration. |
Original sector | Energy |
Location
Country | Azerbaijan |
State | Kalbajar district |
City | Kalbajar |
Source
Source | Caliber.Az |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
