Chemring Energetic Devices Building
One of 10,000+ projects Taiyo tracks in Illinois.
Source: Dodge USA
Project Title: Construction For The Expansion Of The Existing Load/Blend Room. Including: Addition Of 3 New Bays With 1/2 Cmu Wall, Full Cmu External Walls, Installation Of Double Door Into The Existing Load Room. Electrical Will Be Added Per Layout Drawings, All Equipment Will Be Class 2, Div 1 Standards And Will Meet All Of The Dcma (Defense Contract Management Agency) Requirements And Be On The
- Status
- Prospective
- Sector
- Power Generation (CCGT), Aerospace & Defense, Manufacturing (Industrial), Commercial
- Location
- Downers Grove, Illinois, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Chemring Energetic Devices Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Project Title: Construction For The Expansion Of The Existing Load/Blend Room. Including: Addition Of 3 New Bays With 1/2 Cmu Wall, Full Cmu External Walls, Installation Of Double Door Into The Existing Load Room. Electrical Will Be Added Per Layout Drawings, All Equipment Will Be Class 2, Div 1 Standards And Will Meet All Of The Dcma (Defense Contract Management Agency) Requirements And Be On The Approved Site Plan For Dcma. There Will Be No Plumbing Or Sprinkler Modifications. The General C... |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Downers Grove |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Aerospace & Defense, Manufacturing (Industrial), Commercial |
Article published date | 2024-12-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
