logo

Chenab Railway Bridge

Sector: Mass Transit • Location: Katra, Jammu and Kashmir, India

Source: ThePrint

Project
Completed

The Chenab Railway Bridge is a railway bridge constructed over the Chenab river in the Himalayas. It is the world's highest railway bridge, situated at a height of 359 metres above the river, 35 metres higher than the Eiffel Tower. The project faced challenges such as access to the site through steep slopes, initially using horses and mules, and later constructing temporary roads. The bridge was c

Project Information FAQ

Project Information

4 Q
The project “Chenab Railway Bridge” is an infrastructure initiative in the Mass Transit sector, located in Katra, Jammu and Kashmir, India. Taiyo aggregates data on it from ThePrint.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Chenab Railway Bridge is a railway bridge constructed over the Chenab river in the Himalayas. It is the world's highest railway bridge, situated at a height of 359 metres above the river, 35 metres higher than the Eiffel Tower. The project faced challenges such as access to the site through steep slopes, initially using horses and mules, and later constructing temporary roads. The bridge was constructed using the world's tallest crossbar cable cranes and specialized heavy machinery, with massive consolidation grouting to stabilize the slopes. The arch was erected using cantilever construction technique, with the arch meeting at the crown on April 5, 2021. The viaduct construction involved incremental launching on a transition curve and longitudinal gradient, a first for Indian Railways. A NABL accredited laboratory was set up for quality monitoring at every stage. The bridge was inaugurated by Prime Minister Narendra Modi on June 6, 2025.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data