Chenab Railway Bridge
The owner, status and timeline of this project. A free account opens every field.
Source: Hindustan Times
The Chenab Bridge is the world's highest railway arch bridge, standing at a height of 359 meters above the riverbed. It is part of the Udhampur-Srinagar-Baramulla Railway Link (USBRL) project in Jammu and Kashmir, connecting the Kashmir Valley with the rest of India via rail for the first time. The bridge is an engineering marvel built to withstand nature's toughest tests, including seismic sensit
- Status
- Closed
- Sector
- Rail, Bridge, Wind, Steel, Mass Transit, Metal, Government
- Location
- Reasi, Jammu and Kashmir, India
- Updated
- 22 Jul 2026
- Source
- Hindustan Times
ConstructChat
Ask ConstructChat about Chenab Railway Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Chenab Bridge is the world's highest railway arch bridge, standing at a height of 359 meters above the riverbed. It is part of the Udhampur-Srinagar-Baramulla Railway Link (USBRL) project in Jammu and Kashmir, connecting the Kashmir Valley with the rest of India via rail for the first time. The bridge is an engineering marvel built to withstand nature's toughest tests, including seismic sensitivity and high wind speeds. It features a steel construction using around 30,000 metric tons of steel and has a large foundation approximately one-third the size of a football field. The project includes 272 kilometers of railway line with nearly 36 tunnels and about 1,000 bridges, overcoming significant geographic and weather challenges. |
Original sector | Transportation |
Location
Country | India |
State | Jammu and Kashmir |
City | Reasi |
Source
Source | Hindustan Times |
URL |
More Details
Record type | Project |
Sector | Rail, Bridge, Wind, Steel, Mass Transit, Metal, Government |
Article published date | 2025-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
