Chenab Railway Bridge
Completed · Jammu and Kashmir · Last reported Jun 2025
Source: MENAFN.com
The Chenab Railway Bridge is an engineering marvel standing at a height of 1,178 feet above the riverbed, surpassing the Eiffel Tower by 35 meters. It is a key part of the Udhampur-Srinagar-Baramulla Railway Link project and cost approximately Rs 14,000 crore. The bridge is the highest rail bridge in the world and was inspected by the Prime Minister during the inauguration event.
- Status
- Closed
- Sector
- Mass Transit, Government, Bridge, Rail
- Location
- Reasi, Jammu and Kashmir, India
- Updated
- 22 Jul 2026
- Source
- MENAFN.com
ConstructChat
Ask ConstructChat about Chenab Railway Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Chenab Railway Bridge is an engineering marvel standing at a height of 1,178 feet above the riverbed, surpassing the Eiffel Tower by 35 meters. It is a key part of the Udhampur-Srinagar-Baramulla Railway Link project and cost approximately Rs 14,000 crore. The bridge is the highest rail bridge in the world and was inspected by the Prime Minister during the inauguration event. |
Original sector | Transportation |
Budget |
Location
Country | India |
State | Jammu and Kashmir |
City | Reasi |
Source
Source | MENAFN.com |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Government, Bridge, Rail |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
