Chengapalli - Coimbatore - Walayar toll road PPP project
One of 10,000+ projects Taiyo tracks in India.
Source: InfraPPPWorld
The project involves the widening of a 54 km road, the works were divided into two phases: the Chengapalli-Neelambur (six-lane) and the Madukkarai-Walayar (four-lane). It included construction of three bypasses (Perumanallur, Avanashi and KG Chavadi), flyovers, culverts, bus shelters, truck bays, and culverts. The project has been developed as build, operate and tranfer (BOT) on design, build, fin
- Status
- Under Construction
- Sector
- Road
- Location
- India
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Chengapalli - Coimbatore - Walayar toll road PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | project in operation |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the widening of a 54 km road, the works were divided into two phases: the Chengapalli-Neelambur (six-lane) and the Madukkarai-Walayar (four-lane). It included construction of three bypasses (Perumanallur, Avanashi and KG Chavadi), flyovers, culverts, bus shelters, truck bays, and culverts. The project has been developed as build, operate and tranfer (BOT) on design, build, finance, operate and transfer (DBFOT) basis |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project