Chengdu Tianfu International Airport New City Road Project
Sector: Airport • Location: China
Source: World Bank Group
The project consists of six sub-projects, three roads and ancillary works (including underground integrated pipe gallery), three bridges and ancillary works. They are: 3km2 supporting road and integrated pipe gallery project of South Center. The total length of the subproject is 14.941km, the length of the pipe gallery is 1.729km; the starting area (core area) supporting road and integrated pipe g
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of six sub-projects, three roads and ancillary works (including underground integrated pipe gallery), three bridges and ancillary works. They are: 3km2 supporting road and integrated pipe gallery project of South Center. The total length of the subproject is 14.941km, the length of the pipe gallery is 1.729km; the starting area (core area) supporting road and integrated pipe gallery project, the full length of the subproject 31.455km, the length of the pipe gallery is 2.21km; the road and integrated pipe gallery project of the Fuxi North Group Industrial Zone (one batch), the total length of the subproject is 11.136km, the length of the pipe gallery is 1.474km; the east line crosses the Tunxi River Bridge project, the length of the bridge is 300m; the west line crosses the Tunxi River Bridge project, the total length of the bridge is 308m; the north line crosses the Tunxi River Bridge project, the total length of the bridge is 280m. Total investment stands at $ 938. 75 million. Type of concession is BOT with a contract period of 18 years. Financial close took place on March 20, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=298befcb53aa4bd1b905ec493d50446c |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
