logo

Chengdu Tianfu International Airport New City Road Project

Sector: Airport • Location: Sichuan, China

Source: World Bank Group

Project
Active

The project consists of six sub-projects, three roads and ancillary works (including underground integrated pipe gallery), three bridges and ancillary works. They are: 3km2 supporting road and integrated pipe gallery project of South Center. The total length of the subproject is 14.941km, the length of the pipe gallery is 1.729km; the starting area (core area) supporting road and integrated pipe g

Project Information FAQ

Project Information

5 Q
The project “Chengdu Tianfu International Airport New City Road Project” is an infrastructure initiative in the Airport sector, located in Sichuan, China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of six sub-projects, three roads and ancillary works (including underground integrated pipe gallery), three bridges and ancillary works. They are: 3km2 supporting road and integrated pipe gallery project of South Center. The total length of the subproject is 14.941km, the length of the pipe gallery is 1.729km; the starting area (core area) supporting road and integrated pipe gallery project, the full length of the subproject 31.455km, the length of the pipe gallery is 2.21km; the road and integrated pipe gallery project of the Fuxi North Group Industrial Zone (one batch), the total length of the subproject is 11.136km, the length of the pipe gallery is 1.474km; the east line crosses the Tunxi River Bridge project, the length of the bridge is 300m; the west line crosses the Tunxi River Bridge project, the total length of the bridge is 308m; the north line crosses the Tunxi River Bridge project, the total length of the bridge is 280m. Total investment stands at $ 938. 75 million. Type of concession is BOT with a contract period of 18 years. Financial close took place on March 20, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=298befcb53aa4bd1b905ec493d50446c

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data