logo

Chengdu Tianfu International Airport New City Road Project

Sector: Airport • Location: Sichuan, China

Source: World Bank Group

Project
Active

The project consists of six sub-projects, three roads and ancillary works (including underground integrated pipe gallery), three bridges and ancillary works. They are: 3km2 supporting road and integrated pipe gallery project of South Center. The total length of the subproject is 14.941km, the length of the pipe gallery is 1.729km; the starting area (core area) supporting road and integrated pipe g

Status
Prospective
Sector
Airport, Bridge, Manufacturing (Industrial), Road, Government, Commercial
Location
Sichuan, China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Chengdu Tianfu International Airport New City Road Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Chengdu Tianfu International Airport New City Road Project” is an infrastructure initiative in the Airport sector, located in Sichuan, China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of six sub-projects, three roads and ancillary works (including underground integrated pipe gallery), three bridges and ancillary works. They are: 3km2 supporting road and integrated pipe gallery project of South Center. The total length of the subproject is 14.941km, the length of the pipe gallery is 1.729km; the starting area (core area) supporting road and integrated pipe gallery project, the full length of the subproject 31.455km, the length of the pipe gallery is 2.21km; the road and integrated pipe gallery project of the Fuxi North Group Industrial Zone (one batch), the total length of the subproject is 11.136km, the length of the pipe gallery is 1.474km; the east line crosses the Tunxi River Bridge project, the length of the bridge is 300m; the west line crosses the Tunxi River Bridge project, the total length of the bridge is 308m; the north line crosses the Tunxi River Bridge project, the total length of the bridge is 280m. Total investment stands at $ 938. 75 million. Type of concession is BOT with a contract period of 18 years. Financial close took place on March 20, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=298befcb53aa4bd1b905ec493d50446c

Original sector

Transport

Procurement method

Budget

Location

Country

China

State

Sichuan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Airport, Bridge, Manufacturing (Industrial), Road, Government, Commercial

Article published date

2024-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project