Chernivtsioblenergo
Active · Ukraine
Source: World Bank Group
Chernivtsioblenergo was the second-smallest electricity distributor in Ukraine and serviced the neighbouring southwestern region of Chernivtsi, which covered and area of just 8,098 sq km and a population of 0.9 million. It owned a 16,876 km low-voltage transmission grid with 1,463 MVA of transformer capacity and supplied 333,000 customers, including 1,300 industrial consumers.
V.S. Energy Intern
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Government
- Location
- Ukraine
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Chernivtsioblenergo
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Chernivtsioblenergo was the second-smallest electricity distributor in Ukraine and serviced the neighbouring southwestern region of Chernivtsi, which covered and area of just 8,098 sq km and a population of 0.9 million. It owned a 16,876 km low-voltage transmission grid with 1,463 MVA of transformer capacity and supplied 333,000 customers, including 1,300 industrial consumers. V.S. Energy International (a subsidiary of VSE) held a 22% stake in Chernivtsioblenergo. The sponsor is actually VS Energy International LLC based in Ukraine. |
Original sector | Energy |
Location
Country | Ukraine |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Government |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
