Cherokee Lane Paving REBID
Closed · Washington · Last reported Sep 2024
Source: Dodge USA
Cherokee Lane Paving Project Finish grading of subgrade and installation of approximately 100 tons of final pavement surfacing, including joint sealing of base road repair conducted by PUD crews, as required by the City of Mount Vernon in the area depicted on the project plans. The location of the proposed work on Cherokee Lane, Mount Vernon, WA
- Status
- Closed
- Sector
- Commercial, Road, Government, Manufacturing (Industrial)
- Location
- Mount Vernon, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cherokee Lane Paving REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cherokee Lane Paving Project Finish grading of subgrade and installation of approximately 100 tons of final pavement surfacing, including joint sealing of base road repair conducted by PUD crews, as required by the City of Mount Vernon in the area depicted on the project plans. The location of the proposed work on Cherokee Lane, Mount Vernon, WA |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mount Vernon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Government, Manufacturing (Industrial) |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
