Cherry & Kosmos Water Main Improvements & Overlay
Sector: Steel • Location: Morton, Washington, United States of America
Source: Dodge USA
The improvements for which bids will be received is described below: Schedule A: Improvements include installation of approximately 2,938 linear feet of 8-inch DI water main, abandonment of existing 4-inch tar dipped steel water main, fire hydrants, water services, valves, fittings, appurtenances and associated restoration. Schedule B: Improvements include approximately 3,350 linear feet of 20-foo
- Status
- Closed
- Sector
- Steel, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Metal, Commercial
- Location
- Morton, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cherry & Kosmos Water Main Improvements & Overlay
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The improvements for which bids will be received is described below: Schedule A: Improvements include installation of approximately 2,938 linear feet of 8-inch DI water main, abandonment of existing 4-inch tar dipped steel water main, fire hydrants, water services, valves, fittings, appurtenances and associated restoration. Schedule B: Improvements include approximately 3,350 linear feet of 20-foot-wide roadway in two segments; 2,800 linear feet on Cherry Lane, Kosmos Lane, Tilton Way and Cry... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Morton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Metal, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
