Cherry Dam Outlet Works
Sector: Cement • Location: CA, United States of America (USA)
Source: Anvil Builders
Cherry Dam Outlet Works is a project located in Tuolumne County, CA. The outlet facilities at Cherry Dam, which was built in 1956, have reached the end of their service life. The project involves the removal and replacement of the 66-inch hollow-jet valves, installation of reinforced-concrete deck gussets and overhead pipe supports, demolition of the existing instream flow-release system, installa
- Sector
- Cement, Hydro, Water Supply and Storage
- Location
- CA, United States of America
- Updated
- 22 Jul 2026
- Source
- Anvil Builders
ConstructChat
Ask ConstructChat about Cherry Dam Outlet Works
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cherry Dam Outlet Works is a project located in Tuolumne County, CA. The outlet facilities at Cherry Dam, which was built in 1956, have reached the end of their service life. The project involves the removal and replacement of the 66-inch hollow-jet valves, installation of reinforced-concrete deck gussets and overhead pipe supports, demolition of the existing instream flow-release system, installation of the new downstream flow-release system, removal and replacement of the AC distribution panel and lighting systems, installation of 3,000 feet of HDPE bypass line, repair of 2—84-inch butterfly valves, and installation of floating pumps near the intake tower. Underwater diving operations were required for installing and inspecting the primary and secondary isolation measures on the dam’s intake sluice gates. |
Location
Country | United States of America (USA) |
State | CA |
Source
Source reliability | High |
Source | Anvil Builders |
URL |
More Details
Record type | Project |
Sector | Cement, Hydro, Water Supply and Storage |
Article published date | 2023-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America (USA)
- Intrenchment Creek Viaduct Rehabilitation
- Bolton Road & Phillip Lee Pump Stations Rehabilitation
- Clear Creek Chemical System Improvements (Bid Package 1) and System-wide Flow
- Custer Avenue Combined Sewer Control Facility – Additional Screens
- Division Street/Route 65 Interchange Project
- Sorrels Overpass Over I-70
- Route 39 Railroad Crossing Improvements/Overpass/Quiet Zone
- I-44 Rebuild at MO 744/Mulroy Road
