Cherry Gap Disposal Site Roadway Improvements REBID
Sector: Water Supply and Storage • Location: Banner Elk, North Carolina, United States of America
Source: Dodge
Clearing and grubbing inside 4 acres; construction of a roadway and installing cross culvert drainage into a disposal area and placement fill of 14,000cubic yards; including the mechanical excavation and hauling of materials dredged from Buckeye Lake Reservoir.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Road, Commercial, Car parking, Automotive, Waste Processing and Treatment
- Location
- Banner Elk, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cherry Gap Disposal Site Roadway Improvements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Clearing and grubbing inside 4 acres; construction of a roadway and installing cross culvert drainage into a disposal area and placement fill of 14,000cubic yards; including the mechanical excavation and hauling of materials dredged from Buckeye Lake Reservoir. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Banner Elk |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Car parking, Automotive, Waste Processing and Treatment |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
