Cherry Hill Road Shared Use Path
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This contract provides for the creation of a shared use bicycle path along Cherry Hill Road between Foulet Drive and Crestview Drive. The principal items of work consist of the following: approximately 3,300 square yards of asphalt milling; 450 tons of hot mix asphalt 12.5M64 surface course; 350 tons of modified opengraded 12.5 mm friction course; 235 cubic yards of concrete footings and retaining
- Status
- Closed
- Sector
- Mass Transit, Rail, Cement, Government, Road, Car parking, Commercial, Automotive, Manufacturing (Industrial)
- Location
- Princeton, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cherry Hill Road Shared Use Path
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This contract provides for the creation of a shared use bicycle path along Cherry Hill Road between Foulet Drive and Crestview Drive. The principal items of work consist of the following: approximately 3,300 square yards of asphalt milling; 450 tons of hot mix asphalt 12.5M64 surface course; 350 tons of modified opengraded 12.5 mm friction course; 235 cubic yards of concrete footings and retaining walls; 300 linear feet of granite and concrete curb; 2,600 linear feet of traffic marking lines;... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Princeton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Rail, Cement, Government, Road, Car parking, Commercial, Automotive, Manufacturing (Industrial) |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in United States of America
- WMATA Orange and Blue Line Rehabilitation
- Dulles Metrorail Silver Line, Phase 2
- Broadway Substation Upgrades
- QLINE Streetcar Overhead Catenary System
- Blue Line Rail Power System Upgrades
- Congress Heights Station & Tunnel
- Navy Yard Metro West Entrance Modifications
- BART El Cerrito Del Norte Station Modernization Project
