Cherry Valley Solar Farm
Sector: Bridge • Location: Cherry Valley, Arkansas, USA
Source: Renewables Now
Oakland, California-based Adapture Renewables said its 185-MWdc Cherry Valley solar farm in Arkansas has entered commercial operation, rounding out the company's 441-MW Titanium portfolio. The solar project, located in Cross County, Arkansas, reached substantial completion at the end of 2025 and began commercial operations earlier in 2026. The Cherry Valley plant is expected to generate enough ele
- Status
- Closed
- Sector
- Bridge, Solar, Power Generation (CCGT), Raw Materials, Commercial
- Location
- Cherry Valley, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Renewables Now
ConstructChat
Ask ConstructChat about Cherry Valley Solar Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Oakland, California-based Adapture Renewables said its 185-MWdc Cherry Valley solar farm in Arkansas has entered commercial operation, rounding out the company's 441-MW Titanium portfolio. The solar project, located in Cross County, Arkansas, reached substantial completion at the end of 2025 and began commercial operations earlier in 2026. The Cherry Valley plant is expected to generate enough electricity to supply about 30,000 Arkansas homes annually. Adapture acquired, financed, and constructed the Cherry Valley projects in just over two years. This is the final plant to enter commercial operation within the Titanium portfolio, which consists of three sites across Arkansas and Illinois. The portfolio is backed by tax equity financing commitments, a construction loan and a tax credit bridge loan from MUFG, and environmental attributes purchase agreements with Meta Platforms Inc. |
Original sector | Renewable Energy |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Cherry Valley |
Source
Source | Renewables Now |
URL |
More Details
Record type | Project |
Sector | Bridge, Solar, Power Generation (CCGT), Raw Materials, Commercial |
Article published date | 2026-07-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in USA
- Widen Turnpike Mainline SR 91 from WPB Service Plaza to Okeechobee Blvd SR 704
- Widen Turnpike from Glades Rd to Atlantic Ave
- Add Auxiliary Lanes Turnpike TSMO from SR 821 to Griffin Road SR 818
- Widen Turnpike from Southern Blvd to Okeechobee Blvd
- Widen Turnpike from West Palm Beach Service Plaza to Southern Blvd
- Widen Turnpike Mainline from Neptune Road to Osceola Parkway
- Sand Lake Interchange
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
