Chesf-Brennand Sento Se Wind Farms Phase III

Sector: Wind • Location: Brazil

Source: World Bank Group

Project
Active

The companies Brazilian Brennand Energia S.A. (Grupo Brennand; 50.90%) and the state-owned company CHESF (49%) were granted authorizations to a wind complex in the state of Bahia. The wind farm was set to be built in three phases. The following special purpose companies were created to manage each plant:

Phase I (registered in the database with ID# 6871):

  • Pedra Branca S.A. - EOL Pedra Branca (

Project Information FAQ

Project Information

5 Q
The project “Chesf-Brennand Sento Se Wind Farms Phase III” is an infrastructure initiative in the Wind sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The companies Brazilian Brennand Energia S.A. (Grupo Brennand; 50.90%) and the state-owned company CHESF (49%) were granted authorizations to a wind complex in the state of Bahia. The wind farm was set to be built in three phases. The following special purpose companies were created to manage each plant: Phase I (registered in the database with ID# 6871): * Pedra Branca S.A. - EOL Pedra Branca (30 MW) * Sao Pedro do Lago S.A. - EOL Sao Pedro do Lago (30 MW) * Sete Gameleiras S.A. - EOL Sete Gameleiras (30 MW) Phase II (registered in the database with ID# 8267): * Mussambe Energetica S.A. – EOL Mussambe (30 MW) * Morro Branco I Energeica S.A. – EOL Morro Branco I (30 MW) * Baraunas I Energetica S.A. – EOL Baraunas I (30 MW) This present project is the third phase of the wind complex: * Baraunas II Energetica S.A. – EOL Baraunas II (21.6 MW) * Banda de Couro Energetica S.A. – EOL Banda de Couro (12.9 MW) The 35-year contracts were signed with the regulatory agency ANEEL starting in June 2014. In December 2013, both power plants had been granted 20-year power purchase agreements with the several electricity distribution companies through public biddings. The sponsors offered an average tariff of US$ 51.4/MWh (BRL 120.90/MWh). The total investment in this third phase was estimated at US$ 53.8 million (BRL 179.5 million). Construction works commenced in September 2015 and were in advanced stages by December 2015. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures. In June 2016, the state-owned bank BNDES approved a US$ 31.2 million (BRL 115.6 million) loan to the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data