Chestnut Drive Water Main & Sanitary Sewer Main Replace
Sector: Water Supply and Storage • Location: Ashland, Kentucky, United States of America
Source: Dodge USA
Chestnut Drive Water Main and Sanitary Sewer Main Replacement Project -- Replacing 6 diameter sanitary sewer with new 8 diameter sanitary sewer as well as replacing 6 diameter water line with new 6 diameter water line. Both the new sanitary sewer and new water line will connect to the existing sanitary sewer along the north end of Chestnut Drive and travel southeast along Chestnut Dr for approxima
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT)
- Location
- Ashland, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Chestnut Drive Water Main & Sanitary Sewer Main Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Chestnut Drive Water Main and Sanitary Sewer Main Replacement Project -- Replacing 6 diameter sanitary sewer with new 8 diameter sanitary sewer as well as replacing 6 diameter water line with new 6 diameter water line. Both the new sanitary sewer and new water line will connect to the existing sanitary sewer along the north end of Chestnut Drive and travel southeast along Chestnut Dr for approximately 400 linear feet and reconnect to the existing utilities along Prospect Ave. Also included is... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Ashland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
