Chestnut St Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The proposed bridge replacement project includes the full replacement of Chestnut Street over the Ipswich River, N-18-003 (2D4) in North Reading, MA. The bridge replacement includes, but is not limited to, demolition of the existing twin culverts, construction of new bridge abutments, wingwalls, precast concrete deck beams, concrete topping slab, bridge railing, and utility supports. The work also
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Road, Car parking, Automotive, Commercial, Rail, Bridge, Power Transmission, Power Generation (CCGT)
- Location
- North Reading, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Chestnut St Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed bridge replacement project includes the full replacement of Chestnut Street over the Ipswich River, N-18-003 (2D4) in North Reading, MA. The bridge replacement includes, but is not limited to, demolition of the existing twin culverts, construction of new bridge abutments, wingwalls, precast concrete deck beams, concrete topping slab, bridge railing, and utility supports. The work also includes the temporary control of water, construction of rip-rap, modified rockfill slope, full ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | North Reading |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Road, Car parking, Automotive, Commercial, Rail, Bridge, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-01-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
