Cheswick Generating Station Redevelopment Master Report
Sector: Warehouse • Location: Springdale, Pennsylvania, United States of America
Source: Dodge
Charah, through a subsidiary, will be responsible for shutting down and decommissioning the power plant, its ash ponds and landfill and performing environmental remediation. Potential redevelopment uses for the properties could include renewable energy and battery storage to take advantage of the power plant site s existing electric grid connection, reuse of the rail switchyard and transportation
- Status
- Prospective
- Sector
- Warehouse, Power Transmission, Power Generation (CCGT), Data Center, Energy Storage, Residential, Car parking, Seaport, Automotive, Rail, Commercial, Manufacturing (Industrial)
- Location
- Springdale, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cheswick Generating Station Redevelopment Master Report
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | design development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Charah, through a subsidiary, will be responsible for shutting down and decommissioning the power plant, its ash ponds and landfill and performing environmental remediation. Potential redevelopment uses for the properties could include renewable energy and battery storage to take advantage of the power plant site s existing electric grid connection, reuse of the rail switchyard and transportation and logistics that use shipping assets on the Allegheny River. The properties include the primary... |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Springdale |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Warehouse, Power Transmission, Power Generation (CCGT), Data Center, Energy Storage, Residential, Car parking, Seaport, Automotive, Rail, Commercial, Manufacturing (Industrial) |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Warehouse projects in United States of America
- FILL IN 2 OPENINGS BTWN WAREHOUSE & STORAGE USES WITH ELECT & MECH MODIFICATIONS. FIRE SPKLR MODIFY.
- CONSTRUCTION OF A 49,090 SQ. FT. WAREHOUSE 439-0103-002-00 ON A CURRENTLY VACANT PARCEL.
- NEW 5,976-SQUARE-FOOT SPECULATIVE WAREHOUSE BUILDING WITH MEZZANINES ON A VACANT 0.25-ACRE LOT.
- NEW 93,515 SQ.FT. WAREHOUSE BUILDING.
- TI OF (E) WAREHOUSE SPACE TO PROVIDE QN OPEN OFFICE AREA AND RESTROOMS
- TI IMPROVEMENTS OF AN (E) WAREHOUSE,CREATING A CATERING KITCHEN FOR A GROUP THAT DELIVERS MEALS TO SCHOOLS.
- Hillsborough County Operations Complex
- National Museum of the United States Army
