logo

Chevron Summer Pipeline

Sector: Chemical (Industrial) • Location: Canada

Source: Bird Construction

Project
Unknown

Bird was responsible for the installation of approximately 22 kilometres of four-inch flex pipe pipeline for sour gas transport and three-inch flex pipe pipeline for produced water, along with associated risers and tie-ins. Horizontal directional drilling sleeves were high density polyethylene pipe and were fused on site. The scope of work included clearing/grubbing, horizontal directional drillin

Project Information FAQ

Project Information

3 Q
The project “Chevron Summer Pipeline” is an infrastructure initiative in the Chemical (Industrial) sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bird was responsible for the installation of approximately 22 kilometres of four-inch flex pipe pipeline for sour gas transport and three-inch flex pipe pipeline for produced water, along with associated risers and tie-ins. Horizontal directional drilling sleeves were high density polyethylene pipe and were fused on site. The scope of work included clearing/grubbing, horizontal directional drilling for crossings, and the installation of pipeline segments using the plowing method and conventional open-cut. The plowed section of pipeline was completed utilizing a specialized plow and winch that plowed the pipe in place with a single pass in lieu of an open-cut excavation. The utilization of the cutting-edge innovative trenching solutions technology reduced the project duration, as well as ensured a significantly smaller construction footprint, better depth consistency and more stability than traditional trenching and excavation methods.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data