logo

Chevron's First Data Center Power Plant in Texas Permian Area

Sector: Natural Gas • Location: Texas, United States

Source: Engineering News-Record | ENR

Project
Planned

Chevron plans to build a natural gas-fired power generation facility in the Permian Basin, Texas, to support an artificial-intelligence data center. The initial plant will have a capacity of 2.5 GW with potential expansion to 5 GW. The facility will operate behind-the-meter, supplying electricity directly to a co-located data center operator, bypassing the regional grid. Operations are scheduled t

Status
Prospective
Sector
Natural Gas, Data Center, Manufacturing (Industrial), Power Generation (CCGT)
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Engineering News-Record | ENR

ConstructChat

Ask ConstructChat about Chevron's First Data Center Power Plant in Texas Permian Area

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Chevron's First Data Center Power Plant in Texas Permian Area” is an infrastructure initiative in the Natural Gas sector, located in Texas, United States. Taiyo aggregates data on it from Engineering News-Record | ENR.

Participants

Company

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Chevron plans to build a natural gas-fired power generation facility in the Permian Basin, Texas, to support an artificial-intelligence data center. The initial plant will have a capacity of 2.5 GW with potential expansion to 5 GW. The facility will operate behind-the-meter, supplying electricity directly to a co-located data center operator, bypassing the regional grid. Operations are scheduled to begin in 2027.

Original sector

Power & Industrial

Location

Country

United States of America (USA)

State

Texas

Source

Source

Engineering News-Record | ENR

URL

More Details

Record type

Project

Sector

Natural Gas, Data Center, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2025-11-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project