Cheyenne Bridge Rehab Project
Sector: Hydro • Location: Cheyenne, Wyoming, United States
Source: KGAB
The project involves rehabilitation of the Interstate 25 bridges over West Lincolnway and the Union Pacific Railroad tracks in Cheyenne. It includes hydro demolition, expansion joint repairs, latex overlay, pedestal repairs, bearing device modifications, column repairs, and minor slab replacements. The project is set to start on April 3, 2025, weather permitting.
- Status
- Under Construction
- Sector
- Hydro, Bridge, Rail, Road
- Location
- Cheyenne, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- KGAB
ConstructChat
Ask ConstructChat about Cheyenne Bridge Rehab Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves rehabilitation of the Interstate 25 bridges over West Lincolnway and the Union Pacific Railroad tracks in Cheyenne. It includes hydro demolition, expansion joint repairs, latex overlay, pedestal repairs, bearing device modifications, column repairs, and minor slab replacements. The project is set to start on April 3, 2025, weather permitting. |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Cheyenne |
Source
Source | KGAB |
URL |
More Details
Record type | Project |
Sector | Hydro, Bridge, Rail, Road |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
