Cheyenne Data Center Construction
Sector: Water Supply and Storage • Location: Cheyenne, Wyoming, United States
Source: Blaze Media
A large and expensive data center is beginning construction in Cheyenne, Wyoming. The project is expected to consume twice the electrical power of the entire state of Wyoming and could use billions of gallons of water annually without efficiency measures. It will rely on Wyoming natural gas and may involve new pipeline infrastructure.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Power Generation (CCGT), Data Center, Natural Gas, Government
- Location
- Cheyenne, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Blaze Media
ConstructChat
Ask ConstructChat about Cheyenne Data Center Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A large and expensive data center is beginning construction in Cheyenne, Wyoming. The project is expected to consume twice the electrical power of the entire state of Wyoming and could use billions of gallons of water annually without efficiency measures. It will rely on Wyoming natural gas and may involve new pipeline infrastructure. |
Original sector | Technology |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Cheyenne |
Source
Source | Blaze Media |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Data Center, Natural Gas, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States
- Union Power Project El Dorado AR
- Queen Elizabeth Way Widening
- Kosciuszko Bridge Replacement Project, New York, US
- Route 141 Improvement, St. Louis, Missouri
- Virginia’s Smart Road
- SR539 Guide Meridian Ten Mile Road Roundabouts, USA
- Frederick Douglass-Susan B Anthony Memorial Bridge (formerly Troup Howell)
- Gilmerton Bridge Replacement Project
