logo
ProjectClosed

Cheyenne Road Improvements

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge USA

Replace and install new sidewalks (74,353 SF), curb ramps, curbs, street, alley and driveway paving (236,324 SF),drainage, illumination, traffic signals and utility improvements. 1. Cheyenne Road from Lake June Road to Big Thicket Drive - PB17VA17 2. Cheyenne Road from Big Thicket Drive to Elam Road - PB17VA18. The scope of the project is for the reconstruction of two segments of Cheyenne Road fro

Status
Closed
Sector
Car parking, Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Road, Mass Transit, Automotive, Rail, Government, Commercial, Power Generation (CCGT)
Location
Dallas, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Cheyenne Road Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cheyenne Road Improvements” is an infrastructure initiative in the Car parking sector, located in Dallas, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace and install new sidewalks (74,353 SF), curb ramps, curbs, street, alley and driveway paving (236,324 SF),drainage, illumination, traffic signals and utility improvements. 1. Cheyenne Road from Lake June Road to Big Thicket Drive - PB17VA17 2. Cheyenne Road from Big Thicket Drive to Elam Road - PB17VA18. The scope of the project is for the reconstruction of two segments of Cheyenne Road from Lake June Road to Big Thicket Drive and from Big Thicket Drive to Elam Road as Special Project ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Dallas

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Road, Mass Transit, Automotive, Rail, Government, Commercial, Power Generation (CCGT)

Article published date

2024-07-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project