Cheyenne Road Replacement
Design development · Texas · Last reported Mar 2024
Source: Dodge USA
Replace and install new sidewalks (74,353 SF), curb ramps, curbs, street, alley and driveway paving (236,324 SF),drainage, illumination, traffic signals and utility improvements.
- Status
- Prospective
- Sector
- Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Mass Transit, Automotive, Rail, Government, Commercial, Power Generation (CCGT)
- Location
- Dallas, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cheyenne Road Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replace and install new sidewalks (74,353 SF), curb ramps, curbs, street, alley and driveway paving (236,324 SF),drainage, illumination, traffic signals and utility improvements. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Dallas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Mass Transit, Automotive, Rail, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
